The merger Pella – Sietas

The Pella Sietas GmbH results from a merger between JJ Sietas KG and Open JSC Pella. From Hamburgs Russian twin city St.Petersburg. As a consequence of this merger between Sietas and Pella in April 2014 emerges a strong partner in shipbuilding industry who is able to understand customers‘ wishes and to meet the demands of the future.

Your target
is our task!

News

All Posts
Press Releases

27.07.2017

Fresh water generator delivered to Wärtsilä

For the Wärtsilä Serck Como GmbH a fresh water generator type MSF was produced and delivered for further installation on a cruise liner -> detailed information

25.07.2017

Third and so far the heaviest block for Meyer Werft loaded

The third block for the Meyer Werft was loaded to be transported to Papenburg during the evening high tide. Two stabilizers were installed inside. This block is currently the heaviest so far delivered building unit weighs approx. 1,100 tons and demonstrates our growing expertise in dealing with heavy constructions

16.06.2017

Second block for LNG cruise ship delivered to the Meyer Werft

In parallel with the first block, the second block was also manufactured. It contains parts of the machine room. It was loaded on a pontoon in the early morning hours

23.05.2017

First block for LNG cruise ship loaded

The first block for a LNG cruise ship was loaded from the quay on a pontoon to be shipped to the customer Meyer Werft

23.05.2017

Christening of the „Elbphilharmonie“

The new harbor ferry delivered in April to HADAG was christened by the clarinetist Laura Jaeger and received the name “Elbphilharmonie”. On the following tour through the port of Hamburg the event was celebrated on board with guest invited by the new owner.

25.04.2017

Harbour Ferry MV „Elbphilharmonie“ delivered to HADAG

The prototype of the new HADAG type 2020 was delivered after 10 months of planning and construction -> detailed information

15.03.2017

WISTA meeting at Pella Sietas Shipyard

The maritime network “Women’s International Shipping & Trading Association Germany (WISTA)” meets at the Pella Sietas Shipyard. -> detailed information

16.02.2017

Sixth and the last block of the first order for the Meyer shipyard is ready for dispatch

The last of the total of six blocks is loaded to be delivered to the Meyer Shipyard. Production of further new Meyer-blocks has already commenced

References

Being an architect and producer we distribute, design, construct, build and attend the highest-demand products within the segments: